Technical Insights

Façade Installation Risks & Mitigation

Façade Installation Risks & Mitigation

  • Pre-installation verification of structural tolerances, embed locations, and substrate conditions
  • Controlled setting-out and installation sequencing to manage interface and alignment risks
  • Use of adjustable fixing systems to accommodate construction deviations without compromising performance
  • Risks mitigation through mock-ups, method statements, and inspections
Stone Façade Installation

Stone Façade Installation

  • Installation based on approved shop drawings, fixation layouts, and load paths defined during engineering
  • Verification of substrate readiness, embed locations, and support type prior to fixing installation
  • Installation sequencing controlled to maintain stability of stone panels during lifting, fixing, and final adjustment
  • Continuous alignment, level control, and joint consistency checks to achieve structural safety and architectural finish
GRC Façade Systems

GRC Façade Systems

  • Installation carried out in accordance with approved shop drawings, panel layouts, and support frame details
  • Verification of support frames, brackets, and connection points prior to panel lifting and fixing
  • Controlled lifting, temporary support, and sequential fixing to prevent panel stress or damage
  • Continuous control of alignment, joint widths, and tolerances to achieve uniform façade appearance and performance
Mixed Façade Systems

Mixed Façade Systems

  • Installation coordinated through approved interface details and combined setting-out drawings
  • Verification of interface supports, transition details, and fixing compatibility between adjacent systems
  • Sequenced installation planning to manage multiple trades and maintain structural and visual continuity
  • Ongoing alignment and joint coordination to accommodate movement and ensure consistent façade performance
QA/QC in Façade Fabrication & Installation

QA/QC in Façade Fabrication & Installation

  • Fabrication follows approved shop drawings and samples
  • Materials inspected for compliance before installation
  • Dimensional checks ensure alignment and joint consistency
  • Installation quality verified through regular inspections
  • QA/QC supports defect-free handover and long-term performance